- Neighborhoods
-
Community
-
- Overview History Vision Newsroom News Releases Pilot Newsletter Media Contact Projects Volunteer
- Engage Milwaukie Events City Calendar Recreation Biking in Milwaukie Parks and Trails Directory North Clackamas Parks and Recreation Reserve a Room Library
- Schools North Clackamas School District MHS Student of the Month Public Safety Police Clackamas Fire District #1 Code Compliance Emergency Preparedness Emergency Notifications Garbage & Recycling
-
- Business
- Departments
-
Useful Links
-
- Jobs Alerts & Notifications Email Subscriptions Emergency Notifications Meetings City Services A-Z Mapping & GIS
- Contact the City Staff Directory Request a Public Record Report a Code Violation Report a Pothole Report Misconduct Schedule an Inspection Documents & Forms Documents and Reports Forms, Permits, and Applications
- Helpful Links Digital Archives Library Catalog Municipal Code Purchase a Parking Permit Paperless Billing Pay a Ticket or Utility Bill Urban Forest
-
Adams Street Connector
PROJECT OVERVIEW
The Adams Street Connector is part of the City’s adopted South Downtown Concept Plan, which envisions Milwaukie’s small south downtown area as a reinvigorated live/work district within an easy walk of the Willamette River, Kellogg Creek, downtown Milwaukie and every place outside Milwaukie via the MAX system. The Adams Street Connector Project now links Milwaukie’s downtown light rail station with Main Street and represents the first completed project of the South Downtown Concept Plan.
The project was funded through Metro with $450,000 in regional flexible transportation funds. The City redesigned a small portion of the project to increase hardscape area, reduce stormwater runoff, and reconfigure stormwater piping. The redesign effort was completed with assistance by Walker Macy Architecture.
PROJECT CONTACT
Alex Roller
Engineering Tech I/Project Inspector
503-786-7695
Rollera@milwaukieoregon.gov
Click any thumbnail image to view a slideshow