- Neighborhoods
-
Community
-
- Overview History Vision Newsroom News Releases Pilot Newsletter Media Contact Projects Volunteer
- Engage Milwaukie Events City Calendar Recreation Biking in Milwaukie Parks and Trails Directory North Clackamas Parks and Recreation Reserve a Room Library
- Schools North Clackamas School District MHS Student of the Month Public Safety Police Clackamas Fire District #1 Code Compliance Emergency Preparedness Emergency Notifications Garbage & Recycling
-
- Business
- Departments
-
Useful Links
-
- Jobs Alerts & Notifications Email Subscriptions Emergency Notifications Meetings City Services A-Z Mapping & GIS
- Contact the City Staff Directory Request a Public Record Report a Code Violation Report a Pothole Report Misconduct Schedule an Inspection Documents & Forms Documents and Reports Forms, Permits, and Applications
- Helpful Links Digital Archives Library Catalog Municipal Code Purchase a Parking Permit Paperless Billing Pay a Ticket or Utility Bill Urban Forest
-
Overview
Update: The city has completed several projects in the South Downtown area, including the building of a festival street and public plaza. See the chart below for more downtown information.
Axletree Apartments | The city partnered with R&H Construction in the establishment of Axletree Apartments. Axletree Apartments are located in South Downtown District, featuring 110 units, including new studio, one- and two-bedroom, and river views. |
Kellogg Bridge Replacement | The Kellogg Bridge Replacement project was completed one year ahead of schedule, on December 14, 2018. The former bridge has been removed and the new bridge is open to the public. |
Kronberg Park Multi-Use Trail | North Clackamas Parks and Recreation District (NCPRD) is nearly finished with the soft path, and railings. Join us for the grand opening of Kronberg Park Multi-Use Walkway on Saturday, January 25, at 1 pm. |
Main Street Crossing Lowering | This completed project increases clearance and provides better safety for the under crossing. Construction work included advanced warning signs and devices to protect the railroad bridge. |
Milwaukie Bay Park Bank Repair | The Milwaukie Bay Park bank repair construction was completed during the late fall of 2018 to provide bank stabilization. Low water level areas are open to the public. |
Milwaukie High School Improvements | The Milwaukie High School Bond Project improvements began in June 2018. For more information on FAQs and construction updates, you may visit North Clackamas Schools website. |
Northwest Housing Alternatives Campus | The completed Northwest Housing Alternative Campus (NHA) features 28 units, and 8 family shelter units. For more information on NHA, you may visit their 'About Us' tab through their main webpage. |
Phase I: Washington Street Storm Pipe Replacement | This storm water pipe replacement project replaced former under capacity piping in Washington and Main Street, with 24 and 30 in. piping. The new storm water pipeline will run along Washington and Main, from the west side of the TriMet line, to the outfall at Kellogg Lake. |
South Downtown Plaza | The South Downtown Plaza was designed to create a shared street space through a Dutch method called a woonerf. The concept of a woonerf is to enhance the function of a street to serve as a safe shared space for pedestrians, bikes, and vehicles. When Main Street is closed for events, the street functions as an open gathering location. The Plaza meets accessibility compliance standards, and functions as a large accessible crosswalk, which includes signs, domes, and bollards. The Plaza mosaic designs are inlayed within colored concrete to create a smooth and non-slip surface. For additional questions or comments please contact Jennifer Garbely at GarbelyJ@milwaukieoregon.gov |
Washington and Main Street Reconstruction | The Washington and Main Street improvements included new sidewalks, street lighting, water and electrical connections, installation of underground utilities, and reconstruction of the roadways. The design has brought Washington and Main up to Milwaukie Municipal Code standards. |
For the latest news about project impacts and road closures, visit the construction information page and subscribe for email updates.