- Neighborhoods
-
Community
-
- Overview History Vision Newsroom News Releases Pilot Newsletter Media Contact Projects Volunteer
- Engage Milwaukie Events City Calendar Recreation Biking in Milwaukie Parks and Trails Directory North Clackamas Parks and Recreation Reserve a Room Library
- Schools North Clackamas School District MHS Student of the Month Public Safety Police Clackamas Fire District #1 Code Compliance Emergency Preparedness Emergency Notifications Garbage & Recycling
-
- Business
- Departments
-
Useful Links
-
- Jobs Alerts & Notifications Email Subscriptions Emergency Notifications Meetings City Services A-Z Mapping & GIS
- Contact the City Staff Directory Request a Public Record Report a Code Violation Report a Pothole Report Misconduct Schedule an Inspection Documents & Forms Documents and Reports Forms, Permits, and Applications
- Helpful Links Digital Archives Library Catalog Municipal Code Purchase a Parking Permit Paperless Billing Pay a Ticket or Utility Bill Urban Forest
-
CDBG Ramp Enhancement - 2016
Dates
August - September 2016
Project Status
Completed
Budget
$200,000
Contact
Engineering Department
Phone: (503)-786-7606
Fax: (503)-774-8236
Email: engineering@milwaukieoregon.gov
Project Details
The Americans with Disabilities Act (ADA) ensures access to the built environment for people with disabilities. The ADA Standards establish design requirements for the construction and alteration of facilities subject to the law. These enforceable standards apply to places of public accommodation, commercial facilities, and state and local government facilities. A majority of the sidewalk ramps throughout Milwaukie were constructed before ADA regulations were enacted. The purpose of this project is to upgrade existing curb ramps that do not currently meet ADA Standards. There are 42 ramps that will be upgraded and are spread throughout the City. Ramp construction areas are shown in the Ramp Construction Overview Map.
The general ramp construction areas are as follows:
» Lake Road, 28th Avenue to 26th Avenue (10)
» Lake Road & 32nd Avenue (3 ramps)
» Washington Street, 25th Avenue & High School Access (5 ramps)
A large portion of funding for this project is through the Clackamas County Community Development Block Grant Program (which is funded federally through the US Department of Housing and Urban Development). Contract administration (project bidding and advertising, contract award and payment) will be performed by the Clackamas County Community Development Department. City Engineering staff will act as the Project Engineer and Inspector.
Alerts & Updates
UPDATE: 09/27/2016
Contractor will pour concrete ramps at 28th Ave and across from 32nd Ave by the end of September. Contractor will continue with ramps on Lake at 32nd Ave with a goal of having those poured by 10/7/2016. On completion of the above, the contractor will return to Washington St to complete the mid-block crossing near the high school.
Once all the ramps are poured, contractor will complete paving along the curb trenches at all locations.
All of the above work is dependent on weather.