Brookside Forcemain Extension

Dates 
Project Cancelled March 2013
Project Status 
Archived
Budget 
-
Contact 

Matthew Palmer, Associate Engineer
(503) 786-7602
palmerm@ci.milwaukie.or.us

Project Details

The existing 15-inch diameter line within SE Filbert Street that conveys flow downstream of the existing forcemain discharge point is operating at or above capacity (based on analysis in the 1994 Wastewater Master Plan). Construction of the forcemain extension will alleviate the capacity issues within SE Filbert Street and will discharge the forcemain flow at a point in the system that has more available capacity.

Alerts & Updates

Flow monitoring of the pipe reaches downstream of the forcemain discharge showed that the system is not over capacity has stated in the 2010 Wastewater System Master Plan. Therefore, this project is has been cancelled.