- Neighborhoods
-
Community
-
- Overview History Vision Newsroom News Releases Pilot Newsletter Media Contact Projects Volunteer
- Engage Milwaukie Events City Calendar Recreation Biking in Milwaukie Parks and Trails Directory North Clackamas Parks and Recreation Reserve a Room Library
- Schools North Clackamas School District MHS Student of the Month Public Safety Police Clackamas Fire District #1 Code Compliance Emergency Preparedness Emergency Notifications Garbage & Recycling
-
- Business
- Departments
-
Useful Links
-
- Jobs Alerts & Notifications Email Subscriptions Emergency Notifications Meetings City Services A-Z Mapping & GIS
- Contact the City Staff Directory Request a Public Record Report a Code Violation Report a Pothole Report Misconduct Schedule an Inspection Documents & Forms Documents and Reports Forms, Permits, and Applications
- Helpful Links Digital Archives Library Catalog Municipal Code Purchase a Parking Permit Paperless Billing Pay a Ticket or Utility Bill Urban Forest
-
Asphalt Pavement Overlay
Dates
Summer 2018 - Fall 2018
Project Status
Completed
Project Type
Street
Contact
Tessie Prentice, PLA, EIT
Associate Engineer
Phone: 503.786.7548
Fax: 503.774.8236
Email: prenticet@milwaukieoregon.gov
Project Details
The Asphalt Pavement Overlay project is part of the Street Surface Maintenance Program (SSMP), which is a city-wide program to improve our streets.
The Asphalt Pavement Overlays SSMP Project includes paving SE 55th Ave south of SE Firwood St. SE 55th Ave is one of the last gravel roads remaining in the city. The existing gravel will be re-graded to support the new asphalt, and will include new graveled shoulders. The project will also complete asphalt overlays on several city streets, including SE 29th Ave, SE Rockwood St, SE Fieldcrest St, and SE 50th Ave. Please refer to the map to see all streets covered under this project (below).
An asphalt overlay is a paving method used on deteriorating surfaces. Instead of removing the existing asphalt and the base material underneath, a new layer of asphalt is applied to the existing surface. This method of paving can increase the longevity of a street by 8-15 years.
During construction of the Asphalt Pavement Overlays SSMP Project, neighbors and commuters should anticipate noise and dust from construction equipment, on-street parking restrictions to allow contractors to safely work and allow for equipment and materials to be stored, and traffic delays in and near the project areas. Street and lane closures are to be expected during the grading and paving process. Brix Paving was selected as the successful bidder for the project. Brix has notified homeowners on impacted streets regarding temporary closures while paving is being applied.
Paving
- 55th Avenue
Asphalt Overlay
- 29th Avenue
- Sherrett Street
- Rockwood Street
- Hazel Street
- 38th Avenue
- Fieldcrest Street
- Fieldcrest Drive
- 50th Avenue
- Leone Lane
- Willow Street
- Harvey Street
Alerts & Updates
UPDATE 6/28/2019: All work is now complete.
UPDATE 2/22/2019: No timeline for completion date. The work is waiting on weather for the markings and the availability of the saw cutter sub-contractor.
UPDATE 2/6/2019: The majority of work is completed. Fieldcrest Street has one manhole left that needs to be adjusted and pavement markings need to be completed.